New Campus Update

2015-10-21 15.26.54

The foundation has been excavated and poured, and infrastructure for wiring and water are in place. Things are moving along nicely and we have been fortunate with favourable weather conditions so far. Everything is right on schedule! We hope to have the web-cam installed soon!

2015-10-21 15.25.08 2015-10-21 15.35.32 Return to New Campus